



Conversion of a building into 7 apartments
A former priory facing the Vienne, built in tuffeau stone, divided into 7 apartments with complete restoration of the existing structure (roof frame, masonry…). Project delivered.
Every project is different. Here are some of those we have designed and supervised: a medical practice, offices, apartment buildings, homes and holiday cottages.




A former priory facing the Vienne, built in tuffeau stone, divided into 7 apartments with complete restoration of the existing structure (roof frame, masonry…). Project delivered.


Renovation of three charming holiday cottages combining period character with modern comfort: exposed beams, natural materials, careful decoration, full equipment.








Creation of two holiday cottages, with the existing materials showcased as the guiding thread while the whole is modernised.



Older tuffeau-stone building facing the Vienne, divided into 3 studio flats with complete restoration of the existing structure (roof frame, masonry…). Delivered without decoration or furnishing.



Plumbing, waste-water drainage, electrics, plastering and insulation (RT 2012), painting, floor and wall tiling, and bathroom fittings.



Complete redesign of a courtyard: veranda, terrace, wooden deck and swimming pool, with a single point of contact for the whole project.



Attic conversion, including a new shower room. Delivered without the finishing touches (paint, flooring), which the client kept for themselves.


Construction of a new house meeting the RE 2020 standard, followed from the bare plot and foundations.



Conversion of an old space into a love room: stone fireplace and exposed beams kept, metal mezzanine and staircase, mood lighting.

Replacement of the automatic doors in all of the shopping centre's entrance lobbies.
Complete transformation of a unit: demolition (partitions, electrics, ceilings), plumbing, waste-water drainage, electrics, plastering and insulation (RT 2012), painting, floor and wall tiling, plus bathroom and kitchen fittings.
New partitions to divide the premises into three office spaces: alteration of existing partitions, plastering, painting and electrics, semi-glazed partitions, and a new entrance door formed by altering the façade.
Renovation of a main-residence apartment from design to handover: both bathrooms completely renovated, electrics (surface trunking removed), kitchen and sanding of the parquet floors.
A former riverside fisherman's second home, fully converted into a holiday cottage while keeping its authenticity, with respect for the environment and the setting.
Renovation of a retail unit for a brand, inside a shopping centre.
Describe it in a few lines and we will come back to you within 72 hours.
Request a quote